Earlier in the build, 'bout a year ago maybe, I skipped the step for installing the rudder pedal assembly.  I'd read in the VAF forums that it would have to be dropped anyway in order to run coax cables and I didn't want to have to do it twice.  Yesterday I ran the coax from the finish kit, which was easy enough, which took away any excuse I may have had for not installing the pedal assembly.  Or is there?  After several frustrating attempts of trying to get the pedal assembly bolts and washers on in a very difficult-to-reach location I called for backup.  Fortunately my limber, athletic 5'-2" teenage daughter with a black belt in getting at hard-to-reach places was available and able to reach in and get the bolts on for me.
And now rudder pedals are installed!
I have a feeling this won't be the last time I'll need her to build my plane for me.
Natomas Follies
VSB - very slow build
Friday, May 11, 2018
Tuesday, April 24, 2018
Finish Kit Arrives
Yesterday the finish kit arrived.  Woot! Woot!
That would include:  Canopy, canopy frame, landing gear, wheels/tires, brakes, wiring harness, control rods, control cables, pullys, upper and lower engine cowling, bulkhead panel, and a bunch of other stuff.  Can't wait to get started!
Subscribe to:
Comments (Atom)

